中文版 | Sitemap
Home Products Solutions About us Our News Contact Us
Contact

Address: Shicheng County,Ganzhou city, Jiangxi Province,China 

Fax: 0086-797-5710595 /Tel: 0086-797-5711595  

Mob & Whatsapp: 008619970911285

Email :sales2@oremachinery.cn

Contact: Cindy


Our News
Home > Our News > details

Requirements for sampling before mineral testing

Browse:time  Update:2020-11-13

1-201109160945916.png

The selection and preparation of ore processing test samples is a very important work.

Whether sampling is correct will directly affect the representativeness of ore sample, and thus affect the accuracy of ore processing test results.

The results of ore processing test are an important basis for ore deposit evaluation and ore processing design.

If the ore sample is not representative enough, it will not only affect the quality of the ore deposit evaluation and the design of the concentrator, but also make the completed concentrator unable to produce normally and fail to achieve the expected technical and economic results, resulting in the waste of construction funds and the loss of ore deposit resources.


Therefore, the ore samples used in the ore processing test to provide basis for the design of the concentrator must be taken in accordance with the requirements of sampling design and relevant sampling regulations and specifications.

1-20110916054bC.JPG

 

It is an important work for the design department to propose sampling requirements to the design unit in charge of compiling sampling.

In order to complete this work, the internal division of the design department is as follows: related work of sampling which is negotiated by the geological specialty with the unit compiling sampling design, the geological exploration department and the experimental research unit;

Professional opinions on mining and mineral processing are collected internally and sampling requirements are put forward.

In the requirements of sampling, the ore processing specialty should combine with the requirements of ore processing test, and put forward Suggestions on the representativeness and number of ore samples.

Although opinions on the particle size and weight of ore samples should be taken, they should be put forward by the experimental research unit.

 

Only when we understand the importance of sampling, it will be meaningful when we test minerals for our customers.


Jiangxi Hengcheng mining equipment has a professional gold /tin/chrome/diamond ore washing machines and complete set of energy saving and environmental protection mineral processing plant.

For more information about the mineral processing plant or to buy gold mining equipment can call the telephone: 008619970910905 Tina Xu


赣州网站建设赣州太极拳赣州网站制作赣州网站优化赣州网络公司赣州网站设计赣州网页设计赣州网页制作赣州做网站赣州微信公众号赣州太极拳培训赣州太极拳教学赣州太极拳健身赣州陈式太极拳培训赣州太极拳健身队赣州太极拳表演队生活百科网追逐生活百科网美星生活百科网百报生活百科网金虎生活百科网当代生活百科网云山生活百科网
在线客服